Project involved
Project management
Bespoke Fabrication
In-House Design
Construction
White walling, Resin Flooring & Drainage
The brief
One of the UK’s leading pet food manufacturers needed to expand their Dolav bin washroom area due to ongoing capacity expansion.
In addition to this, the existing washroom was in poor condition and needed to be completely refurbished to ensure the hygiene standards were consistent throughout.
Our solution
As the leading factory fit-out contractor in the UK Oakley were the go-to choice to deliver this project on budget and within the timeframes required. With a dedicated project manager as the single point of contact for our client, the project was delivered with minimal disruption or downtime for our client, meaning they could focus on their core business activities.
Summary
The result – a substantially larger and improved washroom environment that meets stringent hygiene standards; and a very happy client!
Project Value: £100 – 500k
Project Timescale: 14 weeks
Get in touch
to discuss your next project
Similar Case Studies
The design and build of a new chocolate coating facility
Our client was juggling multiple projects in-house creating damaging distraction to the core business operations. Oakley provided a turnkey solution to remove the stress and risks a factory fitout project can bring.
Expanding Production, Chillers and Freezer Space for Freshview Foods
The Freshview team had previous experience of running expansion projects in-house, and they saw firsthand how unforeseen costs and overrunning timelines can turn a project plan upside down. They turned to Oakley's turnkey process to ensure the project was delivered on time and within their budget.
Full Factory Fit-Out for Edwards the Welsh Butcher
With very little experience in a project of this nature, the directors of Edwards realised they would need support to ensure their new factory facilities were built to a high standard as well as delivered within their budget and delivery timescales.