Project involved

In-House Design

Project Management

Construction

White Walling, Resin Flooring & Drainage

MEP Consultancy & Installation
The brief
Alec Jarrett Ltd is a family business which was founded in 1926 when they began supplying local butcher shops and expanded over the years to now supply all sectors of retail, catering and manufacturing in the UK and Europe.
As a consequence of their continued growth, the owners of Alec Jarrett recognised a need for increased chiller space at their factory in Bristol.
Previously all expansion and fit-out projects have been dealt with in-house but due to high demand for their products it was not possible to manage ongoing business operations as well as effectively oversee this coldstore project.
Our solution
Having identified a suitable area of their site and with a ground up build in mind, Alec Jarrett needed an experienced partner who could provide a full turnkey approach to the project from initial scoping and design through to handover of a new coldstore.
With a lot of different elements included in this chiller extension project it was important that our client could have a partner who would take care of project management, site welfare, waste removal, hire equipment and risk assessment method statements (RAMS), giving them complete peace of mind that the project would be delivered on time and with zero disruption to the business.
Works included the supply and erection of a steel frame, PIR white walling, installation of refrigeration equipment, a weatherproof PU resin cove, strip curtains and fire doors as well as electrical supplies and LED lighting.
Summary
It was great to work with Alec Jarret on this project; the result is fantastic, and we hope this increased space helps to support their ongoing expansion around the UK and Europe.
Get in touch
to discuss your next project
Similar Case Studies

The design and fit out of a railway arch for a London fresh produce supplier
The owners of Smith & Brock were already snowed under, experiencing rapid business growth, and managing the day-to-day operations of the business they couldn't afford to have any major distractions, and knew they needed to bring in an experienced partner to take on the whole process.

The design and build of a new chocolate coating facility
Our client was juggling multiple projects in-house creating damaging distraction to the core business operations. Oakley provided a turnkey solution to remove the stress and risks a factory fitout project can bring.

Expanding Production, Chillers and Freezer Space for Freshview Foods
The Freshview team had previous experience of running expansion projects in-house, and they saw firsthand how unforeseen costs and overrunning timelines can turn a project plan upside down. They turned to Oakley's turnkey process to ensure the project was delivered on time and within their budget.