Project involved

In-House Design

Project management

Construction

White walling, Resin Flooring & Drainage

MEP CONSULTANCY & INSTALLATION
The brief
Established in 1956, AD Harvey specialise in the depopulation, transportation and processing of British end of lay hens, with an unwavering dedication to the highest quality standards in animal welfare, biosecurity and food safety.
With a current high demand for their poultry products, AD Harvey needed assistance with the expansion of their factory involving a two phase extension to house a new live bird receipt area and waste handling facility. Being a highly trusted family business in their market, their service and reputation could not be put at risk, so the aim was to improve biosecurity and welfare of all poultry on site whilst also improving the local environment.
Our solution
AD Harvey chose Oakley as their partner for this project as we too are a trusted family business, and they valued our expertise and straightforward approach to the project to ensure it was completed successfully with minimal impact on day-to-day operations.
Underpinned by our simple methodology of design, build, deliver, Oakley set out a clear, detailed project program split over two phases to give AD Harvey clear visibility right through to project completion.
For this expansion project we covered the full scope of works including; ground works and oversite, steel frame and connections, drainage and civils including concrete kerbing, resin flooring, white walling, LED lighting, roller shutter doors and PIR pedestrian doors as well as protection such as barriers and bollards.
Summary
With this project complete, AD Harvey are able to increase the production of their poultry products whilst keeping quality and welfare standards high.
It was a pleasure to work with the AD Harvey team to bring their expansion project to life which we hope will benefit their operations in the years to come.
Project Value: £500k – £1m
Project Timescale: 30 weeks
Operations Director
AD Harvey
Get in touch
to discuss your next project
Similar Case Studies

Fit-Out of Production and Packing Rooms for Potts Partnership
Being a small but fast growing business, husband and wife team Owen and Michelle were heavily involved in the day-to-day business operations, so they needed a reliable partner who could take care of the entire fit-out from design to handover.

Chiller Extension Build and Fit-Out for Alec Jarrett
As a consequence of their continued growth, the owners of Alec Jarrett recognised a need for increased chiller space at their factory in Bristol.

Factory Design, Build and Fit-Out for Baboo Gelato
To continue manufacturing their signature artisan gelato the owners of Baboo became aware of the need for relocation to a bigger factory in the Dorchester area to keep production levels to a high standard as well as providing sufficient supply to their cafes and pop up kiosks around the south coast.